Miscellaneous Charges to Customers
Water Division- Budget 2011
| WUC Services Offered | 2010 Rate | 2011 Rate |
|---|---|---|
| 1. (A) Service call by Water Division |
Regular hrs - $65 per call After hrs - $80 per call |
Regular hrs - $65 per call After hrs - $80 per call |
|
(B) Missed Service Appointment |
Regular hrs - $65 per call After hrs - $80 per call |
Regular hrs - $65 per call After hrs - $80 per call |
Distribution Charges | ||
|
2. (A) Installation of Water Services
Services larger than 25 mm - main to lot line and lot line to building All of the above include connection to main and corporation stop to valve. |
Cost plus burden | Cost plus burden |
|
(B) Connection to Main Tap (1) Provide corporation stop on main for 25 mm service |
Iron- $150 Anode Installation (Iron)- $100 PVC- $200 |
Iron- $150 Anode Installation (Iron)- $100 PVC- $200 |
|
(2) Provide connection to main and valve for service larger than 25 mm (Contractor to install service after connection) |
Cost plus burden | Cost plus burden |
|
(3) Provide connection to main and valve for services 100mm and larger (Contractor to install service after connection) |
Cost plus burden | $1,000 deposit-billed cost plus burden |
|
(4) Meter Deposit |
$110 | $110 |
| (C) Curb Box Deposit | Deposit of $350 | Deposit of $350 |
| (D) Repair to Damaged/Frozen Meter | $300 for 5/8" and 3/4" meters with other meters at cost plus burden | $300 for 5/8" and 3/4" meters with other meters at cost plus burden |
| (E) Unmetered Summer Services |
$35 monthly charge for unmetered location Plus service call charge as per (1a) above |
$35 monthly charge for unmetered location Plus service call charge as per (1a) above |
| (F) Unmetered Construction Service | $35 monthly charge | $35 monthly charge |
(G) Boil Water Advisory This fee will be charged in addition to direct costs associated with the repair of the event. This fee is intended to recover costs assocaited with notifications, lab tests and any other administration costs where a boiled water advisory results from work performed by an outside party. No charge will be levied if the boil water advisory is a result of inaccurate WUC locate. |
$500 per event impacting 2 or less services |
$500 per event impacting 2 or less services |
Hydrant Charges | ||
|
3. (A) Hydrant Valve Installation Installing the valve to operate flow of water for hydrant and removal of valve when no longer required |
Regular hours- $65 per call ($130 in total) | Regular hours- $65 per call ($130 in total) |
|
(B) Daily Use of Hydrants The daily use of water relating to the hydrant (excluding weekends and holidays) |
$50 per day | $50 per day |
| (C) Flow testing Public hydrants for 3rd party | $65/hydrant | $65/hydrant |
| 4. Alterations/Repairs of distribution plant or system for all customers (eg. Water main lowering/cut in tee/valve/hydrant relocation) | Cost plus burden | Cost plus burden |
|
5. Subdivision Development Fees and Deposits (A) Subdivision Administration Fee |
No Charge | No Charge |
|
(B) Security Deposit |
10% of the cost of the water works | 10% of the cost of the water works |
|
(C) Service Inspection Fee |
2% of the cost of water works | $50 per service |
| 6. Inspection of private development (ICI projects) | $150 minimum charge $10 per metre of service pipe installed | $150 minimum charge $10 per metre of service pipe installed |
|
7. Disputed Meter Test Note : Charge applied if meter is not found to be defective. Water meter accuracy is not subject to verification by Dept. of Consumer and Corporate Affairs. If customer requests meter check, it must be done in our own shop by our forces. |
$200 | $200 |
|
8. Water Sampling Requests
|
|
|
|
9. New Watermain Disinfection Costs (pressure testing, chlorination etc.) associated with failure due to contractor negligence. There would be no charge for the initial work associated with a new watermain but if WUC forces are required subsequently to return to disinfect the watermain the charge will be levied. |
Cost plus burden | Cost plus burden |
| 10. Maps and Drawings | $10.00 per sheet copy | $10.00 per sheet copy |
| 11. Change in Occupancy (Account Set Up) | $13.50 | $13.50 |
| 12. Disconnect/Reconnection Fee at Meter | $65.00 | $65.00 |
| 13. Collection Charge - charge for field trip by collectors | $13.50 | $13.50 |
| 14. Abandonment Deposits |
|
|
Notes:
- All the above services are subject to a 20% markup if outside city limits
- After hours is defined as between 11:30 PM to 7:00 AM
- Burden includes overhead costs including administration and trucking