Miscellaneous Charges to Customers

Water Division- Budget 2009

WUC Services Offered 2010 Rate 2009 Rate
(1) A. Service call by Water Division Regular hrs - $65 per call
After hrs -
$80 per call
Regular hrs - $65 per call
After hrs -
$80 per call

B. Missed Service Appointment

Regular hrs - $65 per call
After hrs -
$80 per call
Regular hrs - $65 per call
After hrs -
$80 per call

Distribution Charges

(2) A. Installation of Water Services

  • 20 mm service - main to lot line
  • > 20 mm service - lot line to bldg
  • 25 mm service - main to lot line
  • > 25 mm service - lot line to bldg

Services larger than 25 mm - main to lot line and lot line to building

All of the above include connection to main and corporation stop to valve.

Cost plus burden Cost plus burden

B. 1-Connection to Main Tap

Provide corporation stop on main for 20 mm or 25 mm service

Iron- $150
Anode Installation (Iron)- $100
PVC- $200
Iron- $150
Anode Installation (Iron)- $100
PVC- $200

B. 2-Connection to Main Tap >25 mm

Provide connection to main and valve for service larger than 25 mm (Contractor to install service after connection)

Cost plus burden Cost plus burden
C. Curb Box Deposit Deposit of $350 Deposit of $350
D. Repair to Damaged/Frozen Meter $300 for 5/8" and 3/4" meters with other meters at cost plus burden $300 for 5/8" and 3/4" meters with other meters at cost plus burden
E. Unmetered Summer Services

$35 monthly charge for unmetered location

Plus service call charge as per (1a) above

$35 monthly charge for unmetered location

Plus service call charge as per (1a) above

F. Unmetered Construction Service $35 monthly charge $35 monthly charge

G. Boil Water Advisory

This fee will be charged in addition to direct costs associated with the repair of the event. This fee is intended to recover costs assocaited with notifications, lab tests and any other administration costs where a boiled water advisory results from work performed by an outside party. No charge will be levied if the boil water advisory is a result of inaccurate WUC locate.

$500 per event impacting 2 or less services
$1,000 per event impacting >2 services

$500 per event impacting 2 or less services
$1,000 per event impacting >2 services

Hydrant Charges

(3) A. Hydrant Valve Installation

Installing the valve to operate flow of water for hydrant and removal of valve when no longer required

Regular hours- $65 per call ($130 in total) Regular hours- $65 per call ($130 in total)

B. Daily Use of Hydrants

The daily use of water relating to the hydrant.

$50 per day $50 per day
C. Flow testing private fire hydrants $65/hydrant $65/hydrant
D. Private Hydrant Flow/Maintenance $25/hydrant $25/hydrant
(4) Alterations/Repairs of distribution plant or system for all customers (eg. Water main lowering/cut in tee/valve/hydrant relocation) Cost plus burden Cost plus burden

(5) Watermain Inspection

  • (A) Under New Subdivision/Eng/Admin Fee
  • (B) All Other (Operation)
2% of cost of watermain project 2% of cost of watermain project
(6) Inspection of private development (ICI projects) $150 minimum charge $10 per metre of service pipe installed $150 minimum charge $10 per metre of service pipe installed

(7) Disputed Meter Test

Note : Charge applied if meter is not found to be defective. Water meter accuracy is not subject to verification by Dept. of Consumer and Corporate Affairs. If customer requests meter check, it must be done in our own shop by our forces.

$200 $200

(8) Water Sampling Requests

  1. Bacteriological sampling
  2. Lead Sampling
  3. Schedule 23/ 24 Analysis (Metals, Pesticides, PCBs)
  • $115
  • $150
  • $800
  • $115
  • $150
  • $800

(9) New Watermain Disinfection

Costs (pressure testing, chlorination etc.) associated with failure due to contractor negligence. There would be no charge for the initial work associated with a new watermain but if WUC forces are required subsequently to return to disinfect the watermain the charge will be levied.

Cost plus burden Cost plus burden
(10) Maps and Drawings $10.00 per sheet copy $10.00 per sheet copy
(11) Change in Occupancy (Account Set Up) $65.00 $65.00
(12) Disconnect/Reconnection Fee at Meter $65.00 $65.00
(13) Collection Charge - charge for field trip by collectors $13.50 $13.50

Notes:

  • All the above services are subject to a 20% markup if outside city limits
  • After hours is defined as between 11:30 PM to 7:00 AM
  • Burden includes overhead costs including administration and trucking

Search

Community Events

Jan Feb Mar Apr
May Jun Jul Aug
Sep Oct Nov Dec
2009 2010 2011

Quick Links


Water Savers